Unbelievable Facts About Concrete Patio Drain

Concrete Patio Drain –

There’s practically nothing worse than going out on your concrete patio at the starting of summer time to commence up the barbecue for a celebration, only to uncover yourself stepping in a cold puddle of water. Your patio must have been layered in such a way that any collected rain water would run off its surface, but due to the fact it’s really tough to completely level the patio in this way, most home owners deal with puddle-covered concrete patios at some point. Installing a drain is the very best solution to this dilemma. In order to do so, you will require to reduce a drainage channel. This is a labor-intensive task, but you can nonetheless cut a drainage channel oneself by using the tools and following the actions outlined beneath.

Step 1 – Examine Your Patio

Just before your begin plowing into your concrete patio with the jackhammer, you require to recognize the ideal spot to reduce the drainage channel. You want to set up the drain at the spot exactly where water pools and collects. If it is raining, observe to see the path of the flow of collected water. If you’re obtaining dry climate, you can do the same thing by running your garden hose more than the patio.

Step 2 – Establish where Water will Drain

When you reduce your drainage channel, you need to have to take into account both where the water collects on the patio, and where it drains out. You don’t want the drained water to gather at a level part of your yard, generating a stagnant pool that attracts insects. Appear for an region of your yard that has a slope, preferably one that leads to a nearby stream or ditch.

Read More:  Shocking Facts About How To Paint A Bumper

Step 3 – Dig a Trench Outside

Dig a trench in your yard that will drain the water away from the bottom of the patio. You can do this manually with a shovel in order to lessen harm to your yard, or rent a backhoe if you want to achieve the job speedily.

Step four – Cut the Drainage Channel

Now that you know exactly where your drainage channel will start and finish, it’s time to start cutting. For this part of the job, you will need to have a jackhammer, which you can rent from a property repairs shop or yet another specialized shop. Bear in mind, safety initial: wear your security goggles and protective gloves. If you have youngsters or pets, make certain they will not come outside even though you are functioning. With the jackhammer, reduce the drainage channel down to exactly where you dug the trench in your yard, so that the water will flow in the right direction.

Step five – Set up the Pipes

To finish the job, mix the cement and spread a layer (about three inches thick) about the mouth and sides of the drainage channel. Assemble the pipes from your channel drain kit, insert them in the drainage channel and cement them into location. Install the drain grate on your concrete patio after the cement has dried. In your yard, cover the trench with pea gravel and soil.

How to Cut a Drainage Channel in a Concrete Patio